
Homeowners in Slidell (St. Tammany Parish) call New Orleans Concreters for concrete parking lots. Slidell is the largest community on the North Shore, and the work is built for our heavy rain and settling soils, not just for how it looks on day one.
Parking lots that last decades
Concrete parking lots cost more up front than asphalt but last far longer, handle heavy vehicles without rutting, and need little maintenance. We build the base, thickness, reinforcement, jointing and drainage to carry real commercial loads through the Gulf Coast climate.
Built for commercial loads
- Engineered base and thickness for cars, trucks and delivery traffic.
- Proper jointing and drainage so water runs off and the slab controls cracking.
- ADA approaches and striping coordinated as needed.
- Reinforced for the heaviest traffic areas.
Concrete work in Slidell
Slidell is an incorporated city on high ground north of Lake Pontchartrain at the southeastern tip of St. Tammany Parish. It began around 1882 as a construction camp for the New Orleans and Northeastern Railroad, and its oldest district, Olde Towne, has had a preservation commission since 2003. Hurricane Katrina in 2005 flooded homes, businesses and public buildings, including the City Hall complex in Olde Towne.
What the ground in Slidell means for your slab
NRCS soil data for Slidell show mainly Myatt and Stough fine sandy loams with some Prentiss, loamy terrace soils rather than river clays. Myatt is poorly drained and saturated in winter and spring, Stough is somewhat poorly drained with a seasonal water table about 1 to 1.5 feet down in late winter and early spring, and Prentiss is moderately well drained with a perched water table at 2 to 2.5 feet. NRCS data show low shrink-swell for all three. For a slab, that points to a compacted base kept above the wet season water level, grading that sheds water away, and regular control joints.
Permits in Slidell
Slidell is incorporated, so permits come from the City of Slidell's Building Safety, Permits and Code Enforcement division, 250 Bouscaren St., 985-646-4323, with applications through the city's online portal. The city's page does not spell out rules for driveways, patios, sidewalks or right-of-way aprons, so whether a given flatwork job needs a permit should be confirmed with that office or in the city code.
Why Slidell homeowners choose us
- Built on a real base so it does not crack, heave or settle a year later.
- Sealed for the Gulf Coast climate against heat, heavy rain and shifting soils.
- Honest, itemized pricing, in writing, before we start.
- Local crew that answers the phone and shows up when we say.
Serving Slidell and nearby
We cover Slidell and nearby Metairie, Kenner, Gretna, Harvey, Marrero, plus the rest of the New Orleans area. Wherever you are within about 30 miles of New Orleans, the standard is the same.
Common questions
Concrete or asphalt for a parking lot?
Concrete costs more initially but lasts much longer, resists rutting from heavy vehicles, reflects light for lower lighting costs, and needs far less maintenance than asphalt over its life.
How long does a concrete parking lot last?
A properly built concrete lot routinely lasts 30 years or more with minimal maintenance, well beyond a typical asphalt lot.
Do you do commercial concrete work?
Yes. Alongside residential patios and driveways, we pour commercial parking lots, pads, sidewalks and slabs.
Does Slidell's soil shrink and swell like south shore clay?
Much less. NRCS maps mainly Myatt, Stough and Prentiss loams in Slidell, with low shrink-swell. The bigger issue is water: Myatt is poorly drained and Stough has a seasonal water table about 1 to 1.5 feet down in late winter and early spring.
Who handles concrete permits inside Slidell city limits?
The City of Slidell's Building Safety, Permits and Code Enforcement division at 250 Bouscaren St., 985-646-4323. Its web page does not list flatwork rules, so ask that office about a specific driveway, patio or sidewalk.
