
Homeowners in LaPlace (St. John the Baptist Parish) call New Orleans Concreters for concrete walkways and sidewalks. LaPlace is a growing community in the River Parishes, and the work is built for our heavy rain and settling soils, not just for how it looks on day one.
Paths that look good and stay safe
A good walkway is level, properly sloped for drainage, and free of the trip-edges that come from heaving or settling. We pour front walks, side paths, garden paths and public sidewalks to match your patio or driveway.
Finishes
- Broom finish for grip and a clean classic look.
- Stamped or stained to match a decorative patio or entry.
- Exposed aggregate for traction in all weather.
Built to stay level
Most walkway failures are base failures. We compact the base, pour to thickness, and joint correctly so the path stays flat and safe through Louisiana's heat, humidity and shifting soils cycles.
Concrete work in LaPlace
LaPlace is an unincorporated community in St. John the Baptist Parish squeezed between the Mississippi River and Lake Pontchartrain, and the parish's Planning and Zoning office is on West Airline Highway here. Water entered LaPlace homes in Hurricane Isaac in 2012, and many residents had to be rescued from floodwater in Hurricane Ida in 2021. The West Shore Lake Pontchartrain levee, about 18.5 miles from Garyville to LaPlace, is under construction with completion expected in 2030.
What the ground in LaPlace means for your slab
NRCS soil data for LaPlace show Carville silt loam as the most extensive soil, with Cancienne, Schriever and Gramercy clays, and Barbary swamp soils at the edges. Carville is a loamy natural levee soil with low shrink-swell, but it is saturated below about 12 to 30 inches from December through June. Schriever and Gramercy are poorly drained clays with high to very high shrink-swell and slickensides. For a slab, that points to a well compacted base, drainage away from the slab, and closely spaced control joints so clay movement cracks along planned lines.
Permits in LaPlace
LaPlace is unincorporated, so permits come from the St. John the Baptist Parish Department of Planning and Zoning, 1811 W. Airline Highway, LaPlace, 985-651-5565. Its permit application lists culverts as a permit type, with culvert fee estimates from Public Works at 985-652-4815, and asks for a levee district letter of no objection if work is sub-surface and within 1,500 feet of the Mississippi River levee. Whether a driveway or patio alone needs a permit should be confirmed with Planning and Zoning.
Why LaPlace homeowners choose us
- Built on a real base so it does not crack, heave or settle a year later.
- Sealed for the Gulf Coast climate against heat, heavy rain and shifting soils.
- Honest, itemized pricing, in writing, before we start.
- Local crew that answers the phone and shows up when we say.
Serving LaPlace and nearby
We cover LaPlace and nearby Metairie, Kenner, Gretna, Harvey, Marrero, plus the rest of the New Orleans area. Wherever you are within about 30 miles of New Orleans, the standard is the same.
Common questions
Do you repair or replace uneven sidewalks?
Both. Minor settling can sometimes be addressed; badly heaved or cracked sections are usually best replaced so the trip hazard is gone for good.
Can a walkway match my patio?
Yes. We carry the same stamp pattern, color and border across walkways, patios and entries for a cohesive look.
Why do some LaPlace yards stay wet after rain?
NRCS describes Carville silt loam, the most extensive soil mapped in LaPlace, as saturated below about 12 to 30 inches from December through June in normal years, and the Schriever and Gramercy clays on lower ground as poorly drained. Grading a slab to shed water and keeping its base above that wet zone helps.
Does concrete work near the river levee in LaPlace need extra approval?
St. John the Baptist Parish's permit application asks for a letter of no objection from the levee district and other agencies if work is sub-surface and within 1,500 feet of the mainline Mississippi River levee. Planning and Zoning, 985-651-5565, can say whether a given project triggers that.
