
New Orleans Concreters pours concrete parking lots across Harvey, a busy West Bank community across the river from downtown. You get a local crew, honest itemized pricing, and concrete prepped, jointed and sealed to hold up through southeast Louisiana's heat, humidity and soft ground.
Parking lots that last decades
Concrete parking lots cost more up front than asphalt but last far longer, handle heavy vehicles without rutting, and need little maintenance. We build the base, thickness, reinforcement, jointing and drainage to carry real commercial loads through the Gulf Coast climate.
Built for commercial loads
- Engineered base and thickness for cars, trucks and delivery traffic.
- Proper jointing and drainage so water runs off and the slab controls cracking.
- ADA approaches and striping coordinated as needed.
- Reinforced for the heaviest traffic areas.
Concrete work in Harvey
Harvey is unincorporated Jefferson Parish on the West Bank, between Gretna and Marrero, along the Harvey Canal, a shipping route to the Gulf of Mexico. It began as a company town called Cosmopolite City, developed by Joseph Hale Harvey, and was later renamed for the Harvey family.
What the ground in Harvey means for your slab
About half of Harvey is mapped as Westwego clay, a soil of drained former swamp whose upper clay and organic layers dried and shrank irreversibly after artificial drainage, with Cancienne silt loam and Harahan clay making up much of the rest. Westwego clay is poorly drained and very slowly permeable, with a water table 1 to 3 feet down depending on pumping, and NRCS rates it very limited for streets because of shrink-swell, low strength and subsidence. In general, flatwork on soils like these depends on a well-compacted base, grading that sends water away from the slab, and control joints placed to manage cracking.
Permits in Harvey
Jefferson Parish's Building Permits Department (formerly Inspection and Code Enforcement; West Bank office, 1855 Ames Blvd., Marrero, 504-364-3512) lists paving of walkways, driveways and other non-structural paving on private property as exempt from a building permit, though some zoning districts require paving review. Sidewalks, driveway aprons and curb cuts in the parish right-of-way need a permit from the Department of Engineering (504-736-6500). A driveway on a state highway needs a Louisiana DOTD permit.
Why Harvey homeowners choose us
- Built on a real base so it does not crack, heave or settle a year later.
- Sealed for the Gulf Coast climate against heat, heavy rain and shifting soils.
- Honest, itemized pricing, in writing, before we start.
- Local crew that answers the phone and shows up when we say.
Serving Harvey and nearby
We cover Harvey and nearby Metairie, Kenner, Gretna, Marrero, Westwego, plus the rest of the New Orleans area. Wherever you are within about 30 miles of New Orleans, the standard is the same.
Common questions
Concrete or asphalt for a parking lot?
Concrete costs more initially but lasts much longer, resists rutting from heavy vehicles, reflects light for lower lighting costs, and needs far less maintenance than asphalt over its life.
How long does a concrete parking lot last?
A properly built concrete lot routinely lasts 30 years or more with minimal maintenance, well beyond a typical asphalt lot.
Do you do commercial concrete work?
Yes. Alongside residential patios and driveways, we pour commercial parking lots, pads, sidewalks and slabs.
Do I need a permit to replace the driveway apron at the street?
Yes, when the apron is on parish right-of-way. Jefferson Parish requires a driveway permit from the Department of Engineering for any new, replacement or additional driveway apron, and that permit also covers the public sidewalk. Engineering can be reached at 504-736-6500; replacement driveways can also be discussed at 504-349-5174. If the street is a state highway, the permit comes from Louisiana DOTD instead.
What is the soil like under most of Harvey?
USDA maps about half of Harvey as Westwego clay, which formed in clayey alluvium and organic material in a former swamp that shrank irreversibly after drainage. It is poorly drained, holds water 1 to 3 feet down depending on pumping, and is rated very limited for streets by NRCS.
